|
澳大利亚标准组织今天发布了AS/NZS 60335.2.9/A1:2011,其内容可以在SAI global的网站免费下载。看了一下,内容主要是修改了22.113针对多士炉的弹射装置,提出了专门要求。
2 h Y& I8 y" W$ y( V' x$ P' O由于欧洲还没有发布针对IEC 60335-2-9:2008的EN版本,所以欧洲什么要求还不知道。, w4 x# w; t" E3 J3 u G
8 q3 f! a* n2 T; s9 e; w% v
内容如下,大家可以探讨一下:* t/ C8 `0 J2 ?
8 L1 p, I+ _, |, V- r8 _' K9 n% p22.113 Replace the text by the following.
( n: ~: A9 ?" |- p9 A7 ^1 IToasters having an ejector mechanism shall be constructed so that they switch off, m$ z8 f6 M7 q( h/ d6 i, J/ I0 u
automatically after the normal toasting time even if the ejector mechanism is
/ B# p; w/ j: \' \blocked by the bread.
2 d- }( b6 O: R) _- f) XFurthermore, toasters having an ejector mechanism shall be constructed so that' H1 ~( m$ L0 c" W+ x4 s: U( e2 T
they switch off automatically after the normal toasting time even if the operating3 S8 n3 L* y% a+ u/ l1 _; J
lever is held down. This requirement is not applicable to toasters having an ejector+ J: G: d5 j# p$ w. m* q7 M
mechanism if the operating lever is recessed so as to avoid it being inadvertently9 }3 h& M, T! C$ Y; R) m3 ?
held down by a vertically moving roller door or the like.( c- [$ L: q+ A7 I6 o1 e/ K {
Compliance is checked by inspection and by the following tests for ejector/ Z @' X' L$ e" ^5 k
mechanisms blocked by the bread and for toasters not having a recessed operating" \; p" ~6 J& p9 X2 c3 l
lever.9 O {' q, @7 S' ~/ x
The toaster is supplied at rated voltage and the ejector mechanism is prevented+ `$ L4 K% g0 `) l& M- ?4 `% A2 d
from releasing. On the completion of the normal toasting time, heating elements$ `. N Y7 Z9 B" _
shall be automatically disconnected from the supply by at least an all-pole
+ A; Q/ p5 j6 o) Tdisconnection, micro-disconnection. However, a single pole, micro-disconnection
. U: L0 \/ E, X* R$ Jis allowed, provided heating elements are not accessible to the test probe 12 of IEC
- M. W9 }8 X/ `; F61032.
/ h7 a, V/ l% y `3 s9 ZFor toasters not having a recessed operating lever, the test is repeated, the( K% W7 }* y! D. u
toaster being supplied at rated voltage with the operating lever prevented from1 m2 Z6 E( H4 Y/ |0 S1 D
releasing. On the completion of the normal toasting time, heating elements shall be
5 L9 j; J6 I" W' Gautomatically disconnected from the supply by at least an all-pole disconnection,
9 V O- y0 D& e P" F* f: `# x, l7 u) Vmicro-disconnection. However, a single pole, micro-disconnection is allowed,
2 s9 ^/ `* J" x, S2 I9 c& Gprovided heating elements are not accessible to the test probe 12 of IEC 61032. |
|