搞过toaster的是否遇到过这两个测试的矛盾点?6 B5 ]$ e$ H+ {0 o. [
7 F' s3 M7 X- ]: ~: M8 B! A
60335-2-9里cl.19.102 规定:
5 J C- f: J7 M# |
' |2 h% ] s: ~+ y8 M19.102 Toasters, loaded with the bread specified for normal operation, are operated at
: c/ x# Y/ c2 Q7 {, [rated power input. The ejector mechanism is prevented from releasing and the supply is
! y8 W& h; ~, Imaintained to the toaster after the timer has completed its maximum cycle.
7 M9 ?4 d" o& x& J
" u! p- w% I# r6 F+ ]5 S4 W
5 [$ {$ m/ [5 w' |然后到了cl.22.113里又说:
6 x6 J/ m; z8 W2 h4 s8 C
" p; |) H U9 q22.113 Toasters having an ejector mechanism shall be constructed so that they switch off
' U) L1 F, }4 I9 `automatically after the normal toasting time even if the ejector mechanism is blocked.
$ U0 G3 n/ y1 T# x" G3 E5 ?- x" oCompliance is checked by the following test.
& Y# I& x2 \! s$ oThe toaster is supplied at rated voltage and the ejector mechanism is prevented from0 h* A/ ?( K" Z" X' X3 k
releasing. On the completion of the normal toasting time, heating elements shall be
9 C5 g ~6 r, p: E$ @) Bautomatically disconnected from the supply by at least an all-pole disconnection, microdisconnection.2 Q6 j+ |8 {' h. N, m5 C
However, a single pole, micro-disconnection is allowed, provided heating9 J5 b1 h( d: h: j' h* u
elements are not accessible to the test probe 12 of IEC 61032.% v9 N* p: @# e8 q% m. c
; J: E% |* o3 Q' w6 E
* I# k, {# l9 z- f% r
什么样的机制能使得ejector mechanism失效后,全级断开开关能动作啊?