如题所示,关于IEC60950-1:2005中Routine Test 耐压测试时间与电压设定,我本人从标准中一直没看到有比较明确的说法。3 M3 P K5 u! [" E/ D- B- ]/ h' L
根据5.2.2章节有如下内容:2 n. t6 J* l7 ]+ r% S
Where, elsewhere in this standard, ROUTINE TESTS are required to be conducted in accordance
' V6 ]0 k# V5 T+ y+ X: p0 Twith 5.2.2, it is permitted to reduce the duration of the electric strength test to 1 s and to
1 t) |; q6 b- B- `: o7 u" Z9 G# rreduce the test voltage permitted in Table 5C, if used, by 10 %.6 @$ p$ j6 {4 a7 Y' R Y7 {) v' v
1 y. f' ]* p/ T4 q
这个内容说时间可以减少到1秒,电压可以根据表C来进行,但是说得很模糊,尤其是
' ^4 u# |% R1 k7 o# ?% \Where, elsewhere 这两个单词,不好理解到底是哪里。是否也包括LN对地?我们产线上打的地方就是LN对地。
8 a! J! e3 q+ G
5 y# o* o8 D" q: |0 Q还有在Annex U 中有如下内容:
, B: M( Q; P0 T* o! yU.3.1 Routine testing1 W! r5 K5 W; @. m5 r8 D% P3 q
The test voltage for ROUTINE TESTING shall be the appropriate test voltage in accordance with6 Q' S# h p6 p# d5 z& L$ Z p& M
5.2.2 of this standard, with a minimum of* d" a6 Q7 Y/ F1 y( g
– 1 500 V a.c. r.m.s. for BASIC INSULATION or SUPPLEMENTARY INSULATION, or
. p: W) h0 y1 v; J' J; N– 3 000 V a.c. r.m.s. for REINFORCED INSULATION.4 {$ T/ r, d& a# B1 G
但是我一直觉得Annex U 只适用于Insulated winding wires for use without interleaved insulation,而不是用于我们产线上的位置(我们产线一般就打LN对地)。
* X! z' m) a0 i* I8 t5 x! W8 r, I3 K* I) }& b
希望各位可以引出标准进行讨论。 |
|