安规网

 找回密码
 注册安规
安规论坛 | 仪器设备 | 求职招聘 | 国家标准 公告 | 教程 | 家电 | 灯具 | 环保 | ITAV 签到 充值 在线 打卡 设备 好友| 帖子| 空间| 日志| 相册
IP淋雨机 | 证书查询 | 规范下载 | 资质查询 招聘 | 考试 | 线缆 | 玩具 | 标准 | 综 合 红包 邮箱 打卡 工资 禁言 分享| 记录| 道具| 勋章| 任务
水平垂直燃烧机 | 针焰 | 灼热丝 | 漏电起痕
IP防水防尘设备|拉力机|恒温恒湿|标准试验指
灯头量规|插头量规|静风烤箱|电池设备|球压
万年历 | 距元旦节还有
自2007年5月10日,安规网已运行
IP淋雨设备| 恒温恒湿箱| 拉力机| 医疗检测设备沙特Saber 埃及COI 中东GCC|CoC直接发证机构水平垂直燃烧机|灼热丝|针焰试验机|漏电起痕试验机
灯头量规|试验指|插头插座量规|灯具检测设备耐划痕试验机|可程式恒温恒湿试验箱 | 耦合器设备广东安规-原厂生产-满足标准-审核无忧
查看: 1581|回复: 3

EN 60335-2-105

[复制链接]
发表于 2008-12-5 10:21 | 显示全部楼层 |阅读模式
广东安规检测
有限公司提供:
22.7 Replacement:
8 Y, o. B/ U, [  t1 Q3 \; RAppliances having a steam bath function shall incorporate adequate safeguards against the) e' v5 j0 l4 d! Z2 R1 k
risk of excessive pressure.) Z2 i& z$ N5 B5 n& @. R

8 L  x; s$ l; @& m; N7 Y8 F+ SIf jets of steam or hot water are emitted through protective devices, the electrical insulation
. B; \+ m% ~! xshall not be affected or the user exposed to a hazard.
* j  _, e9 T8 b$ Z
+ B3 J8 @" I$ T. d8 jCompliance is checked by inspection and by the following test.
, d, c6 j; w( L# s( Q* \2 G$ H0 r# A
For non-pressurized boilers, the water shall be supplied at a pressure not exceeding 150 kPa.
6 K* i# f1 o% V* R* w' J  Y7 e( h  i# ?/ U. ^
For pressurized boilers, the maximum pressure occurring during the test of Clause 11 with the
6 ?; N; t2 c6 {# F: K; Y' nboiler filled but without steam emission is measured. All pressure-regulating devices$ C7 z. Z6 I+ S9 P2 |! Z& ~
that operated during the test are rendered inoperative and the pressure measured again. The
7 U3 \- u5 l, b/ K6 g; Wpressure shall not increase by more than 200 kPa.
# p- M, m+ b8 s& q* k+ v7 d' h. ?1 z2 p* R2 L' @0 }5 ^- o, v( I  {
Any pressure-limiting protective device is then rendered inoperative and the pressure in
! w  f, G. l0 ~5 Z6 U" ]8 C& @; ethe boiler is raised hydraulically to five times the pressure measured originally or twice the8 R: R7 P7 s2 ]2 s( h/ ~
pressure measured with the pressure-regulating device operating during the test of Clause 11
+ l9 e9 p7 Q' F' |$ K4 X. u4 g  Wrendered inoperative, whichever is higher. There shall be no leakage from the boiler.
4 s0 h4 D) P" k. X3 H$ k. r$ z9 V  p4 X
请教有哪位大侠做过EN60335-2-105的22.7这个章节的测试?能否帮讲解一下这个测试怎么做,如何去理解这个条款?9 F: O6 q2 k* v4 I
什么叫做是non-pressurized boilers; pressurized boilers 它们的定义是什么啊?
8 G! A) T* h0 k4 p% H& u
8 k4 t9 L' L. t0 M% f万分感激!
发表于 2008-12-5 11:05 | 显示全部楼层
楼主怎么发贴到这儿来了???
发表于 2008-12-5 13:50 | 显示全部楼层
发表于 2009-11-12 09:35 | 显示全部楼层
有新版吗?旧版什么时候过期?
您需要登录后才可以回帖 登录 | 注册安规

本版积分规则

关闭

安规网为您推荐上一条 /1 下一条

QQ|关于安规|小黑屋|安规QQ群|Archiver|手机版|安规网 ( 粤ICP13023453-10 )

GMT+8, 2024-11-25 15:48 , Processed in 0.071109 second(s), 21 queries .

Powered by Discuz! X3.4

© 2001-2023 Discuz! Team.

快速回复 返回顶部 返回列表