直流侧可有可无,通过short test评估就OK;* d0 q r% U5 I7 V9 G( R0 P
交流侧就看你设计了,要样机里没有,需在说明书中说明装机时交流侧用的外置Fuse的Rating,相关要求如下(IEC 62109-1):
6 }) [. F' {! H( h, S% E$ z' N
0 E( A; T3 E3 o# G% L4.4.4.5 Output short circuit
% T. r$ t: A4 U& w# xEach power output port of the PCE, and each section of a tapped output, shall be tested one
. Z' y! M: f9 n" V' ?' i& p6 \8 fat a time, to simulate short circuits in the load or wiring. Overcurrent protection devices as
8 j) j! V+ u# Q4 D$ y( Gprovided in the PCE or as specified in the installation instructions, shall be fitted during the
9 e% y& G2 T- v: \test. All other outputs are loaded or not loaded, whichever load condition of normal use is less: q) n. u/ z- s" Q' f3 g
favorable.
" l) V4 p9 R- } l' ZTesting is required to be performed on all combinations of terminals for the port under
% f- N* W J' g: a# T' c8 S- G- uconsideration, two at a time, including neutral and earth terminals, and one test with all l1 L$ K2 u+ _" H# U: w3 j
current-carrying terminals of the port shorted together at once. Where analysis shows that the: M% N8 q p& a6 Y) F' B
test for one combination is representative of other combinations, tests may be omitted.
9 Q {1 z" }- b3 v/ n$ CIn addition to the requirements of 4.4.3, the short-circuit currents are to be recorded and if" G4 |, E J2 i4 a4 A0 Y
they exceed the maximum rated current of the circuit, the maximum measured current shall be
+ |7 Y/ |& U) ^1 }- |3 o8 qprovided in the installation manual for the purpose of coordination of overcurrent protection of- o8 m: C7 D% t+ I- k2 }
the external circuit conductors (see 5.3.2).
8 R$ l; U1 ^. O" a }! r4 OThe value(s) to be recorded and to be provided with the PCE instructions are the peak3 M. ?+ k4 N: G( Q9 ~. V
current, and the highest of the RMS current values measured or calculated over a time period U7 H: l: W% C# T- D0 ]' `
as follows:5 S$ P1 F$ g* c7 Z' f+ \6 ^; e
a) for AC signals, 3 cycles of the nominal AC frequency for the port under consideration, in0 M! L( H, u& r1 T* d- _
which case the value is to be stated as the 3-cycle RMS value;
7 _9 V3 |; j+ P& n Z8 N: wb) for all signals, the duration of the short circuit from the time the short circuit is applied, until
6 o1 k R) ]3 {2 \ r, l) kthe time the short circuit current is interrupted by a protective device or other mechanism, in, C, A5 S+ |2 p' c" L+ L1 u9 m' k; m
which case the value stated is to include the RMS value and the time period in seconds;" l( l5 J5 p. N, j' }
c) for short circuit tests that result in a continuous non-zero value, the steady-state RMS
8 |# n; E2 z e0 ^value, in which case the value is to be stated as a continuous RMS value.+ y7 Z0 J4 s4 S4 U
NOTE Where the intended use of the short-circuit current information requires a different type of measurement,
: ~; d5 m7 `% E c& c1 o7 Dadditional data may be provided. For example, for AC mains fault current contribution some utilities may prefer a- A3 ^& f: T1 k
¼-cycle RMS or other RMS calculation to the 3-cycle RMS above. |
|