安规网

 找回密码
 注册安规
安规论坛 | 仪器设备 | 求职招聘 | 国家标准 公告 | 教程 | 家电 | 灯具 | 环保 | ITAV 签到 充值 在线 打卡 设备 好友| 帖子| 空间| 日志| 相册
IP淋雨机 | 证书查询 | 规范下载 | 资质查询 招聘 | 考试 | 线缆 | 玩具 | 标准 | 综 合 红包 邮箱 打卡 工资 禁言 分享| 记录| 道具| 勋章| 任务
水平垂直燃烧机 | 针焰 | 灼热丝 | 漏电起痕
IP防水防尘设备|拉力机|恒温恒湿|标准试验指
灯头量规|插头量规|静风烤箱|电池设备|球压
万年历 | 距元旦节还有
自2007年5月10日,安规网已运行
IP淋雨设备| 恒温恒湿箱| 拉力机| 医疗检测设备沙特Saber 埃及COI 中东GCC|CoC直接发证机构水平垂直燃烧机|灼热丝|针焰试验机|漏电起痕试验机
灯头量规|试验指|插头插座量规|灯具检测设备耐划痕试验机|可程式恒温恒湿试验箱 | 耦合器设备广东安规-原厂生产-满足标准-审核无忧
查看: 2303|回复: 13

[线缆测试] 十万火急!求翻译VN内容

[复制链接]
发表于 2009-11-23 15:08 | 显示全部楼层 |阅读模式
广东安规检测
有限公司提供:
Earth Grounded-Now the conductor coming from the pay-off reel is bare and it is not earth-grounded  at the pay-off
- e8 B8 [3 ]7 k! o& K* u% ~reel nor at any other point at which continuous contact with the bare conductor, prior to the insulating process.$ V' F$ b4 e. x- M
Requirements: see spark test requirment6 P7 L4 F* F9 Q1 a# m& z% P, O
* y' ~( i+ e* R9 Z1 t  Q
请问此句话的大意是什么?
! X- }: z6 S# s3 ~4 t' Y* m& r我看是和火花机测试有关,求证是否是说火花机故障了
发表于 2010-1-14 20:17 | 显示全部楼层
UL人员开VN时是会讲清楚的,说明你没有与UL人员打好关系,
发表于 2009-11-27 09:09 | 显示全部楼层
学习了
发表于 2009-11-26 15:57 | 显示全部楼层
接地:從開卷機有導線裸露且未接地,裸露導線,因無絕緣處理,與開卷機持續接觸。/ T" }$ X) b) @+ ?$ F& A
他是要求看火花測試相關要求。
发表于 2009-11-26 15:31 | 显示全部楼层
又学习了点,强烈要求政府组织把UL的所有标准都翻译成中文的给大家免费使用。
发表于 2009-11-25 16:14 | 显示全部楼层
我就不搬标准了,这个VN我开过,意思就是产品上的裸露的导体要接地,否则就要提供绝缘。 没啥别的意思了
发表于 2009-11-25 16:02 | 显示全部楼层
,学习拉
发表于 2009-11-24 19:19 | 显示全部楼层
说得很对啊,押出机我绞铜机都必须接地措施。这是在有规定的。
发表于 2009-11-23 15:47 | 显示全部楼层
对于火花测试,UL 2556中有要求,会涉及到接地问题(包括收放线,火花机)
2 B" e9 q4 {0 J# F" }6.7.3 Preparation of specimens3 g% L7 y- Z- c. r9 M2 V; Y" U$ c
6.7.3.1 If the conductor coming from the pay-off reel is bare, the conductor shall be earth-grounded prior
3 @/ m1 _; V0 Jto the insulating process.
2 B4 ~4 ]0 Z' F7 a6.7.3.2 If the conductor coming from the pay-off reel is insulated, an earth-ground connection shall be! F1 J& e  x8 B( r- y! t/ r
made at either the pay-off or take-up reel. For 5.26 mm2 (10 AWG) and smaller-sized single-conductor
8 t1 e" k+ v! Ncables, an earth-ground connection shall be made at both the pay-off and the take-up reels unless the
% z. y1 z9 h: g6 e8 Cconductors have been tested for continuity and found to be of one integral length.. j+ ^0 a$ j7 s7 ^( t9 C) @
6.7.3.3 For other cable constructions, the outermost conductive components shall be earth-grounded.
$ j4 e' a2 M  [2 t5 b; r# Q6.7.3.4 Each earth-ground connection shall be bonded directly to the earth ground of the spark tester.
发表于 2009-11-23 15:40 | 显示全部楼层
引用第2楼stevenyu于2009-11-23 15:27发表的  :& O/ t+ x; ^$ }8 T) ?
地线接地—/ ?0 ~# w2 b1 S8 r! W3 N$ ~
现在从放线轴出来的导体是裸露的,绝缘工序前面,放线轴既没有接地也没有在任一点连续的接触裸导体。: I  N: j2 z/ f4 T8 G0 \/ R7 h
要求:见花火测试要求。
是这个意思
您需要登录后才可以回帖 登录 | 注册安规

本版积分规则

关闭

安规网为您推荐上一条 /1 下一条

QQ|关于安规|小黑屋|安规QQ群|Archiver|手机版|安规网 ( 粤ICP13023453-10 )

GMT+8, 2024-11-27 00:08 , Processed in 0.074431 second(s), 21 queries .

Powered by Discuz! X3.4

© 2001-2023 Discuz! Team.

快速回复 返回顶部 返回列表