以下条款摘自UL153,不管你回答合格还是不合格都是有问题的,请仔细看标准
PART V ' Y Q7 _: \5 O1 S+ P' G. ?
MANUFACTURING AND PRODUCTION TESTS 3 ^! I, m* n4 C5 A- ?- }! v9 d
194 Manufacturing and Production Tests
+ e0 u# g' H/ ~$ J3 |194.1 General 0 n, f- t8 z( M
194.1.1 The following test described in 194.2 applies to portable luminaires having accessible dead metal parts or low circuits. Compliance criteria is described in 194.3. ! j: z1 T9 r0 v. L9 O
194.1.2 A dielectric test shall also be conducted on portable luminaire subassemblies that are shipped with factory made wiring connections.
0 K2 ~% g8 {) m* ~. W2 T1 z% W% a194.2 Test method % O$ L" Z7 S% V+ @
... % B# C1 W8 j9 r/ I! s% M, K
Exception No. 3: When a portable luminaire employs a solid-state component that in not relied upon to reduce the risk of electric shock, and is capable of being damaged by the dielectric potential, the test is to be conducted before the component is electrically connected. In this case, a sample is to be selected at random from production each day and tested at the potential specified in 194.2.2. The circuitry is to be rearranged as required for the purpose of the test to reduce the risk of solid-state-component damage while retaining the representative dielectric stress of the circuit.
: R3 N9 ]& D, L1 j7 X' I
& ?4 h! @: u! d% y, V( n9 M不过请楼主最好说明一下产品的类别和出口地. |
|