安规网

 找回密码
 注册安规
安规论坛 | 仪器设备 | 求职招聘 | 国家标准 公告 | 教程 | 家电 | 灯具 | 环保 | ITAV 签到 充值 在线 打卡 设备 好友| 帖子| 空间| 日志| 相册
IP淋雨机 | 证书查询 | 规范下载 | 资质查询 招聘 | 考试 | 线缆 | 玩具 | 标准 | 综 合 红包 邮箱 打卡 工资 禁言 分享| 记录| 道具| 勋章| 任务
水平垂直燃烧机 | 针焰 | 灼热丝 | 漏电起痕
IP防水防尘设备|拉力机|恒温恒湿|标准试验指
灯头量规|插头量规|静风烤箱|电池设备|球压
万年历 | 距元旦节还有
自2007年5月10日,安规网已运行
IP淋雨设备| 恒温恒湿箱| 拉力机| 医疗检测设备沙特Saber 埃及COI 中东GCC|CoC直接发证机构水平垂直燃烧机|灼热丝|针焰试验机|漏电起痕试验机
灯头量规|试验指|插头插座量规|灯具检测设备耐划痕试验机|可程式恒温恒湿试验箱 | 耦合器设备广东安规-原厂生产-满足标准-审核无忧
查看: 702|回复: 0
打印 上一主题 下一主题

[EMC] DSH 734 Application of bursts on cabinet earth point

[复制链接]
跳转到指定楼层
楼主
发表于 2012-9-4 16:30 | 只看该作者 回帖奖励 |倒序浏览 |阅读模式
广东安规检测
有限公司提供:
DSH 734
, @% b8 @5 V  A, a" y
" r* Z) I: ?) N
Application of bursts on cabinet earth point6 |( ?. H" }7 n0 r. Y
7.2.2.3 and figure 111 _2 K* T' q: s& ]/ `
61000-4-4(ed.2)
7 h5 z+ x" h' u5 \  V/ k
9 [/ w: x: I0 t7 ~( i1 P" j
Question:; x  J* m3 a. g% L6 F9 h7 e5 a
For EFT testing, IEC-61000-4-4: 2004, Clause 7.2, test set-up for type tests performed in laboratories, has 3 conditions for coupling the test voltage to the Equipment Under Test: Clause 7.2.2.1 Power supply ports, Clause 7.2.2.2 I/O and Communications Ports and Clause 7.2.2.3 Cabinet Earth Port.9 T/ U7 L3 l: \1 K
For power supply ports ,Clause 7.2.2.1, Figure 9 is referenced which indicates a common mode coupling. So for a single phase product with a PE conductor, the coupling would be L+N+PE and for a 3 phase product the coupling would be L1+L2+L3+PE or L1+L2+L3+N+PE. This is fairly clear and straight forward. However, for the cabinet earth port, Clause 7.2.2.3, the standard states: "The test point on the cabinet shall be the terminal for the protective earth conductor…" as shown in Figure 11. Figure 11, reproduced below for convenience, is for post-test installation tests and for floor standing devices. Yet, if you look at figure 11, the PE test point that is referenced in Clause 7.2.2.3 is the same test point as PE in the supply port coupling path.% t$ d: D: A1 ?( s! M$ b+ W
For laboratory tests on any floor standing or table top product, should the PE port be tested as a stand alone test point after the application of the common mode test on all lines, including PE, or is this a test only applicable, if a separate earth point is provided on the product?
8 ~% b+ ^  q" g8 ]+ dIn other words, does PE get tested by itself since Clause 7.2.2.3 indicates the test point on the cabinet shall be the terminal for the protective earth, or is it sufficient to indicate that PE complies when tested as part of the supply port (for example L+N+PE) as long as a separate cabinet earth point is not available on the product?
1 R3 v5 w) F5 z! hDecision:' R: O; ~9 }/ ^( v
PE as a part of the mains cable is not the same as the “cabinet earth point”. The test on the “cabinet earth point” will only be applicable if called out in a product or a product family standard. It is removed in the most recent versions of generic standards. Clause 7.2.2.3 addresses additional earth points on the cabinet, if available.
/ w. m# P; C8 }9 U5 @
# I# r- x& j. W# [2 W2 q3 i5 |
& U2 E; F% \& T+ @1 `) y) @7 W3 m+ u& L

本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?注册安规

x
您需要登录后才可以回帖 登录 | 注册安规

本版积分规则

关闭

安规网为您推荐上一条 /2 下一条

QQ|关于安规|小黑屋|安规QQ群|Archiver|手机版|安规网 ( 粤ICP13023453-10 )

GMT+8, 2024-11-23 00:56 , Processed in 0.068915 second(s), 25 queries .

Powered by Discuz! X3.2

© 2001-2013 Comsenz Inc.|广东安规赞助

快速回复 返回顶部 返回列表