* b4 h! J5 s1 P1 h) mIn addition, double and reinforced insulation shall withstand the partial discharge test according to 7.5.3, if the recurring peak working voltage across the insulation is greater than 700 V and the voltage stress on the insulation is greater than 1 kV/mm.
1 Q) } d! y7 u7 W- m) bCompliance is shown by impulse withstand voltage test according to 7.5.1 and the a.c. or d.c. voltage test according to 7.5.2, and partial discharge testing according to 7.5.3 if applicable.
" N" f; b+ y& s; Z
. y1 N. N9 I6 n) f8 {7 pStarting from a voltage below the rated discharge voltage UPD a, the voltage shall be linearly increased to 1,875 times UPD and held for a maximum time of 5 s+ u, p. {' A/ H: ]! _' `9 ?/ N$ E
The voltage shall then be linearly decreased to 1,5 times UPD (± 5 %) and held for a maximum time of 15 s, during which the partial discharge is measured
6 j# M+ P6 ~- P# I. a+ qThe test shall be considered to have been successfully passed if the partial discharge is less than 10 pC during the measurement period