frankpeng
发表于 2011-6-25 10:48
Andy, thank you for your strong support, you are welcome.
Andy.Yang
发表于 2011-6-25 10:56
you, too...
xadzkjdxhj
发表于 2011-6-25 12:24
i have a question.if there are two factory adresses and names in the UL files,how the FUS execute?only one factory is OK?
Andy.Yang
发表于 2011-6-25 12:38
every manufactruing location listed in the UL FUS procedure needs to be inspected,as well two FUS inspection fee will occur...
Andy.Yang
发表于 2011-6-25 12:41
And if in this case, and for some locations shown in the FUS procedure, there's no production for a long time( more than half year), then you can apply for UL on-call procedure, then the inspection frequency will be once per year, as well, the inspection fee will only need to be paid for once, not four times....
xadzkjdxhj
发表于 2011-6-25 12:55
according to flankpeng,maybe their old factory is not existed( such as,the house had pushed down),in this condition,only the first option can choose?
H-RH
发表于 2011-6-25 13:22
I'm afraid that UL will require your new factory to conduct the IPI again for each authorized UL file!It is because UL may assume the production line is a new setup in new location.
oceansheng
发表于 2011-6-26 00:19
各位讲的很专业,学习了~~~
cwlee
发表于 2011-6-26 19:05
引用第16楼H-RH于2011-06-25 13:22发表的:
I'm afraid that UL will require your new factory to conduct the IPI again for each authorized UL file!It is because UL may assume the production line is a new setup in new location.
I agree on this count, if you have many authorized UL files, every authorized UL file needs to be inspected too.