jxyglby 发表于 2007-7-5 19:18

这个在UL817标准中有作具体规定.请看第100条:
a) A 1250Va-c(40-70Hz)test potential applied for 1 minute,
b) A 1500Va-c(40-70Hz)test potential applied for 1 second.
也就是说,当电压调到1500伏时,测试时间只需1秒钟即可.

gamblegan 发表于 2007-7-6 09:24

UL 817
MANUFACTURING AND PRODUCTION TESTS
104 Dielectric Voltage-Withstand Test
104.1 Each cord set and power-supply cord shall be capable of withstanding without electrical
breakdown, as a routine production line test, the application of a test potential between line conductors
and between each line conductor and grounding conductor, if provided, using one of the following
methods.
a) A 1250 V a-c (40 – 70 Hz) test potential applied for 1 minute,
b) A 1500 V a-c (40 – 70 Hz) test potential applied for 1 second,
c) A 1770 V d-c test potential applied for 1 minute, or
d) A 2100 V d-c test potential applied for 1 second.

yzyjy 发表于 2007-7-10 11:32

耐压时间:如果按标准数据测量,通常电压为1000+2U时间为1分钟;但因在线测量通常不可能这样按标准做,而是将电压加大1.2倍时间缩短为1S.

wangwang 发表于 2007-8-7 11:49

同意Barry所说,补充一下,在IEC标准体系中
60s是用于型式实验的,也就是说型式实验时不能采用升压快速测试方法
1s是用于生产线流水作业的,目的是为了提高生产效率,通常是做100%检测的,也叫routine test, 根据我所知道的,一般采用升压1.2倍左右,有些产品安规标准中是规定了电压值的

yeming12345 发表于 2007-8-7 18:04

在网上找到的,有关耐压测试和火花试验的参考电压和测试时间,很有用。

yeming12345 发表于 2007-8-7 18:05

[忘了附件

xiaoxiangtongzi 发表于 2007-8-10 20:06

耐压时间:如果按标准数据测量,通常电压为1000+2U时间为1分钟;但因在线测量通常不可能这样按标准做,而是将电压加大1.2倍时间缩短为1S.

非常正确~
日规的插头线和欧规的都是按照这个办法来用于生产中的~

计算方法~:
125V的插头线.测试电压=1000V+2*125V=1500V

xiaoxiangtongzi 发表于 2007-8-10 20:09

18楼的资料非常好!!
建议将欧规和AS规格以及BS规格的也列上来
那样更加全面.

mingda1014 发表于 2007-12-28 09:22

21楼的,1000+2*125=1500?这个等式也成立啊?

nellhu 发表于 2007-12-28 10:11

问个简单的问题:
耐压测试和火花试验 (Dielectricvoltage withstand test and flash test) 有什么不同?